Investigating Public Perception Toward The Level Crossing Without Railway Gate Crossing (Case Study: At JPL 297 and 294 Lamongan)

Authors

  • Handoko Indonesian Railway Polytechnic
  • Natriya Faisal Rachman Indonesian Railway Polytechnic
  • Firdaus Ade Kurniawan Indonesian Railway Polytechnic
  • Rao Guangjiong Southwest Jiaotong University

DOI:

https://doi.org/10.37367/jrtt.v1i1.7

Keywords:

Level crossing, safety, closure

Abstract

According to the Minister of Transportation regulation No. 36 article 4, year 2011 concerning the intersection of level crossings, the minimum distance between crossings is 800 meters. However, this regulation has not been well implemented at the level crossings of JPL 297, 295, and 294 at Sukodadi Village, Lamongan Regency. Since the regulations are not implemented yet, hence the accidents frequently occur. Therefore, this study was conducted to find out public perceptions of the planned closure of JPL 297 and 294. This study applied descriptive quantitative method by calculating LHR and vehicle queue lengths. Among the three JPLs, the JPL with the highest LHR was JPL 295 with the total of 249 vehicles per hour. Meanwhile, the longest queue of vehicles occurred at JPL 295 reaching 23 meters. Furthermore, the data were analyzed by using multiple linear regression. The findings claimed that the indicators of benefits involved convenience and safety in 180, 11,506 and 7,781, while the result of the public perception obtained 66.8%.

References

Z. Zhang, X. Liu, And K. Holt, “Positive Train Control (Ptc) For Railway Safety In The United States: Policy Developments And Critical Issues,” Util. Policy, Vol. 51, Pp. 33–40, 2018.

F. Septiadi, “Makalah Kebijakan Publik: Penyediaan Transportasi Darat Di Daerah Perkotaan Padat Penduduk,” 2018.

I. S. Lubis, S. E. Priana, And A. S. Yusman, “Pengaruh Perlintasan Kereta Api Terhadap Arus Lalu Lintas Disimpangtunggulhitam Kotapadang,” Ensiklopedia Res. Community Serv. Rev., Vol. 1, No. 1, Pp. 38–48, 2021.

D. Herianto And A. M. Siregar, “Analisis Solusi Kemacetan Pada Simpang Sebidang Kereta Api Jalan Urip Sumoharjo,” J. Rekayasa Sipil Dan Desain, Vol. 9, No. 3, Pp. 491–502, 2021.

M. Tri, “Analisis Faktor-Faktor Yang Mempengaruhi Kemacetan Lalu Lintas Di Perlintasan Sebidang (Studi Kasus Di Perlintasan Sebidang Mranggen-Kab. Demak),” Skripsi, 2019.

S. Asfiati And D. T. Mutiara, “Studi Keselamatan Dan Keamanan Transportasi Di Perlintasan Sebidang Antara Jalan Rel Dengan Jalan Umum (Studi Kasus Perlintasan Kereta Api Di Jalan Padang, Bantan Timur, Kecamatan Medan Tembung),” Prog. Civ. Eng. J., Vol. 1, No. 2, 2021.

R. Mounce And J. D. Nelson, “On The Potential For One-Way Electric Vehicle Car-Sharing In Future Mobility Systems,” Transp. Res. Part A Policy Pract., Vol. 120, Pp. 17–30, 2019.

W. F. Yanti, “Studi Pengaruh Perlintasan Sebidang Jalan Dengan Rel Kereta Api Terhadap Karakteristik Lalu Lintas (Studi Kasus: Perlintasan Kereta Api Jalan Hj. Ani Idrus),” 2018.

O. F. Abioye Et Al., “Accident And Hazard Prediction Models For Highway–Rail Grade Crossings: A State-Of-The-Practice Review For The Usa,” Railw. Eng. Sci., Vol. 28, No. 3, Pp. 251–274, 2020.

J. Liu And A. J. Khattak, “Are Gates At Rail Grade Crossings Always Safe? Examining Motorist Gate-Violation Behaviors Using Path Analysis,” Transp. Res. Part F Traffic Psychol. Behav., Vol. 55, Pp. 314–324, 2018.

P. Singh, J. Pasha, A. Khorram-Manesh, K. Goniewicz, A. Roshani, And M. A. Dulebenets, “A Holistic Analysis Of Train-Vehicle Accidents At Highway-Rail Grade Crossings In Florida,” Sustainability, Vol. 13, No. 16, P. 8842, 2021.

D. Jatim, “Retrieved From Sijaka,” 2018, [Online]. Available: Https://Monika.Dishubjatim.Id/Map/

J. Liang, K. M. Koo, And C. L. Lee, “Transportation Infrastructure Improvement And Real Estate Value: Impact Of Level Crossing Removal Project On Housing Prices,” Transportation (Amst)., Vol. 48, No. 6, Pp. 2969–3011, 2021.

N. P. Murnaka And S. R. Dewi, “Penerapan Metode Pembelajaran Guided Inquiry Untuk Meningkatkan Kemampuan Pemahaman Konsep Matematis,” J. Medives J. Math. Educ. Ikip Veteran Semarang, Vol. 2, No. 2, Pp. 163–171, 2018.

D. Jatim, “Data Kecelakaan Perlintasan Sebidang Jawa Timur 2021.,” Jawa Timur, 2021.

T. Sudarwanto, “Pengaruh Kualitas Layanan Dan Harga Terhadap Kepuasan Pelanggan Jasa,” e-Journal UNESA, 6., 2018.

Downloads

Published

2022-05-31

How to Cite

Handoko, H., Faisal Rachman, N., Ade Kurniawan, F. ., & Guangjiong, R. . . (2022). Investigating Public Perception Toward The Level Crossing Without Railway Gate Crossing (Case Study: At JPL 297 and 294 Lamongan). Journal of Railway Transportation and Technology, 1(1), 38–46. https://doi.org/10.37367/jrtt.v1i1.7

Issue

Section

Articles